How do you plan to feed
the shredder (i.e., conveyor, loader, manually) ?
At what rate do you plan
to feed the shredder (pounds / hour, tons / hour)?
Other considerations in
feeding the shredder?
DESIRED PARTICLE SIZE
(Describe the particle size you wish to achieve and why):
DOWNSTREAM EQUIPMENT
(Describe the equipment / process downstream):
SPECIAL LIMITATIONS AND
AVAILABLE POWER [Describe any limitations that may apply
(i.e., space available, maximum weight, voltage, frequency,
and available amperage, etc.)]:
ENGINEERING REQUIREMENTS:
Is there need for
value-added engineering / consulting ?
Does your application
require a turnkey system or individual components ?
OTHER PERSONNEL AT
YOUR COMPANY WITH WHOM YOU WILL CONSULT WHO ARE, OR WILL
BE, INVOLVED IN THIS PROJECT:
First Name:
Last Name:
Title:
IS THERE A
REQUIREMENT FOR FINANCING? (Available
in U.S. and Canada only)